Vibrating screen gold mining washing equipment

Vibrating screen gold mining washing equipment

Processing Capacity: varies by model size; refer to the parameters for specific details.
Feed Size: 350 mm ~ 425 mm
Processed Materials: Placer gold ore, placer gold, diamonds, etc.
Application Field: Mainly used for the recovery of free gold from placer gold ore and vein ore, river placer gold, placer gold mines, tailings reprocessing, dry land/shallow water gold mining.
More details contact us at +8613849119469

Vibrating screen gold mining washing equipment

— Vibrating screen gold washing Equipment Overview —

Gold mining equipment, also known as portable gold extraction equipment, is a type of machinery mainly used for sorting placer gold ore. As a mobile gold mining device, it can be fed manually or by a loader into the hopper. The materials are then screened by a trommel screen or a washing drum. Large-grained waste is discharged, while the remaining materials are further concentrated by a vibrating sluice box or a fixed sluice box.

Processing Capacity: varies by model size; refer to the parameters for specific details.
Feed Size: 350 mm ~ 425 mm
Processed Materials: Placer gold ore, placer gold, diamonds, etc.
Application Field: Mainly used for the recovery of free gold from placer gold ore and vein ore, river placer gold, placer gold mines, tailings reprocessing, dry land/shallow water gold mining.

Specification of gold ore mining washing screen

规格型号

Specification

滚筒直径

Diameter(mm)

滚筒长度Length(mm) 处理能力Capacity(T/h) 功率Power(kw) 出料Discharge(mm) 进料Feedstock(mm) 外形尺寸Dimensions(L*W*H)(mm) 重量Weight(kg)
GMTS1225 1200 2500 30-50 5.5 0-100 ≤300 4146*1600*2680 2200

 

Any detail inquires please feel free to contact us:
Sales Manager: Alanna.Liu
Mobile/Whatsapp: +8613849119469
Email Adds: alannaliu2049@126.com

1 review for Vibrating screen gold mining washing equipment

  1. Alanna

    ABC Mining Co. (Brazil)
    “We’ve used 15 units of your trommel screens for 3 years in the Amazon basin. The gold recovery rate increased by 15% compared to our previous equipment. The after-sales team’s 48-hour on-site response during critical failures saved us millions in downtime losses.”

Add a review

Your email address will not be published. Required fields are marked *