GMTS0519  type  Gold mining Trommel screen equipment

Sale!

GMTS0519  type  Gold mining Trommel screen equipment

Original price was: ¥108,000.00.Current price is: ¥98,000.00.

Processing Capacity : Varies by model size; refer to the parameters for specific details.
Feed Size: 350 mm ~ 425 mm
Processed Materials: Placer gold ore, placer gold, diamonds, etc.
Application Field: Mainly used for the recovery of free gold from placer gold ore and vein ore,river placer gold, placer gold mines, tailings reprocessing, dry land/shallow water gold mining.

More details contact us at: +8613849119469

GMTS0519  type  Gold mining Trommel screen

— Gold mining Trommel screen Overview —

Gold mining equipment, also known as portable gold extraction equipment, is a type of machinery mainly used for sorting placer gold ore. As a mobile gold mining device, it can be fed manually or by a loader into the hopper. The materials are then screened by a trommel screen or a washing drum. Large-grained waste is discharged, while the remaining materials are further concentrated by a vibrating sluice box or a fixed sluice box.

Processing Capacity : Varies by model size; refer to the parameters for specific details.
Feed Size: 350 mm ~ 425 mm
Processed Materials: Placer gold ore, placer gold, diamonds, etc.
Application Field: Mainly used for the recovery of free gold from placer gold ore and vein ore,river placer gold, placer gold mines, tailings reprocessing, dry land/shallow water gold mining.

—Specification of Gold mining trommel screen

规格型号

Specification

滚筒直径

Diameter(mm)

滚筒长度Length(mm) 处理能力Capacity(T/h) 功率Power(kw) 出料Discharge(mm) 进料Feedstock(mm) 外形尺寸Dimensions(L*W*H)(mm) 重量Weight(kg)
GMTS0519 500 1910 5-10 1.5 0-100 ≤300 3000*1000*1800 550

—Core Structure of Gold Mining Trommel Screen —

Main Body:

An inclined screening drum (composed of multi-section screen meshes for classification from fine to coarse). High manganese steel/stainless steel screen meshes are commonly used, and the drum body is made of carbon steel/stainless steel.

Drive System:

A motor plus a reducer (or chain) that drives the drum to rotate at a low speed (usually 10–20 rpm).
Water Supply System: Central direct flushing + side spraying to strip clay and sediment from the surface of gold particles.

Auxiliary Components:

Frame, feed hopper, discharge hopper, sealing cover, and comb-shaped screen cleaning mechanism (for anti-clogging).

—Core Advantages Gold Mining Trommel Screen—

Anti-clogging & High Efficiency:

Rolling scrubbing + water flushing solves the problem of screen clogging caused by wet and sticky materials. The screening efficiency can reach over 90%, which is superior to that of vibrating screens.

Flexible Mobility:

Usually integrated on a trailer chassis, operable by 1–2 people. No disassembly is required for relocation, and it can be used immediately upon arrival at the mining area (plug-and-play).

High Gold Recovery Rate:

Multi-stage screening + sufficient desliming fully expose gold particles. Combined with subsequent gold separation equipment, the gold recovery rate can reach over 90%.

Environmental Protection & Energy Saving:

Sealed design reduces dust emission; optional water circulation system can save 70% of water.

—Application Scenarios for gold mining trommel screen—:

Selection Recommendations:
High clay content: Choose a washing-type trommel screen with auger to enhance desliming effect.
Mobility requirement: Select a traction-type/self-propelled gold mining vehicle (integrated with trommel screen + sluice box/centrifuge).
Fine-grained gold-dominated: Equip with a combination of vibrating sluice box and centrifuge to improve the capture rate of micro-fine gold.

Any detail inquires please feel free to contact us:

Sales Manager: Alanna.Liu

Mobile/Whatsapp: +8613849119469

Email Adds: alannaliu2049@126.com

1 review for GMTS0519  type  Gold mining Trommel screen equipment

  1. Alanna

    Golden Horizon Ltd. (South Africa)
    “After 5 years of 24/7 operation, 90% of our original trommel components are still functional. The spare parts delivery to our desert site is consistently within 5 days. Excellent value for money.”

Add a review

Your email address will not be published. Required fields are marked *